|
|
|
Bulls White Sox Training Academy
3" Isocyanurate Insulation
60ml GAF TPO Fully Adhered |
|
|
|
Four Lakes Condominums
-2.0 Isocyanurate
-45ml GAF Everguard TPO
-Mechanically fastened system
10-year System
|
|
|
|
Billy Graham Center
-U.S. Intec Workhorse Basesheet
-U.S. Intec GBSP4
-Certainteed Grand Manor Shingles
-12-year System
|
|
|
|
Cameo Condominums
-1/2" Recovery Board
-Diamond Base Sheet
-Certainteed STA Modified
-Certainteed GTA Modified
20-year System |
|
|
|
Bill Kay Cheverolet
-2.0 Isocyanurate
-45ml GAF Everguard TPO
-Mechanically fastened system
-10-year System |
|
|
|
|
Commercial Building 1433 Fullerton
-1/2 celotex recovery board
-Fiberglass basesheet
-US Intec GBSP4
-Mechanically fastened system
-12-year System |
|
|
|
Animal Clinic
-3.0" Isocyanurate
-45ml GAF Everguard TPO
-Mechanically fastened system
-10-year System |
|
|
|
Wheaton College Student Services Building/Williston Dormitory
- APP Modified bitumen roofing system
- White granulated surface
- Tapered insulation system
- 30-year fiberglass 3-tab shingles |
|
|
|
Wheaton College Dining Hall
- APP Modified bitumen roofing system
- Aluminum coating
- 1.5” isocyanurate insulation
- 30-year architectural shingles |
|
|
|
Christ Church of Oakbrook
- APP Modified bitumen roofing system
- White granulated surface
- ½” recovery board over existing roof
- Heavy hand-split cedar shakes
|
|
|
|
|
Briarcliff Townhomes
- GAF Master Elite System
- Royal Sovereign shingles
- Weather Watch ice and water shield
- Shingle Mate felt
- A sampling of 50 buildings
|
|
|
|
Multiple Commercial Complex
-2.0" Isocyanurate
-fiberglass basesheet
-US Intec GBSP4 & SP4
-Granulated & Coated roof systems
-12-year Systems |
|
|
|
Cox Automation
- APP Modified bitumen roofing system
- Aluminum coating
- 1.5” isocyanurate insulation
|
|
|
|
5th Ave. Station
-1/2" Recovery Board
-U.S. Intec Workhorse Basesheet
-U.S. Intec GBSP4
-Entire Building |
|
|
|
Dury Design
- Isosyanurate Insulation
- 45ml TPO
- Mechanically Fastened System
|
|
|